CONTAINERISED SUBSTATIONS





Quality Assurance
Every Containerised Substation undergoes comprehensive factory inspection and testing prior to dispatch, including:
- Transformer Routine Tests
- Switchgear Functional Tests
- Protection Relay Verification
- Interlock Checks
- Wiring Continuity Tests
- Insulation Resistance Tests
- Operational Simulation Tests
- Complete Factory Acceptance Test (FAT)
This approach significantly reduces site installation time and commissioning risks.